Demolition
We provide full demolition of old bathroom as required for new design-
- We relocate plumbing & electrical services
- Repair framework or floors as required
- Re-sheeting walls
- Re plaster ceiling
- Waterproofing to standards
- Re-level floors for required falls to drains, etc
- Tiling
- Carpentry
- Plasterwork
How long does a Bathroom take to renovate?
An average size Bathroom can be demolished and the room prepared within a week ready for waterproofing and tiling.
The Tiler takes over the site and is normally finished within a week.
Then the plumbing and electrical are ready for fit off.
Finally installing items such as vanity, mirror, shower screen and other fixtures and fittings is completed and the bathroom is ready to use.
We allow 2-3 weeks from start to completion for most bathrooms.